top of page

How to Brief a Property Development Video

Shot By Taz
Jun 27
3 min read

Updated: Nov 8

Aerial drone view of a site, the kind of establishing shot used in a property development film

Start with who is watching. Most property videos miss because the brief tries to serve a planning committee, an investor and the neighbours in one film. The footage looks expensive and lands with nobody.


Here's how to brief a property development video so it does one job properly, and how to get three jobs out of a single shoot.



Why do most property development videos fall flat?


Because they're built for everyone. The formula is familiar by now: two minutes of aerial, a run of CGI renders, a logo end card. Technically fine. Strategically empty.


It could be any development in the region, and the people it was meant to persuade can tell.


The fix isn't better drone work. It's a sharper brief.



Who is the video actually for?


Name one audience before anything else gets decided. Each one watches differently and wants something different from the film.


A planning committee watches on a laptop in a meeting. They want evidence: massing, context, how the scheme sits against the streets around it. Measured pace, clear narration, no dramatic score.


Investors want confidence. Scale, credibility, a team that looks like it delivers. This is where CGI and aerial earn their place, cut with more energy.


Residents want to know what changes for them. The new park, the school places, what happens to traffic on their road. That needs a human voice and plain language, filmed at street level rather than from above.



What should a property video brief include?


Three answers, written down before a shoot date is booked:


  1. Who is watching, and where they'll see it.

  2. What they should think or do once it ends.

  3. The one message they must leave with.


Everything else follows from those: tone, length, whether you need a narrator, whether the drone goes up at all. A brief that only lists shots is a shot list, and a shot list can't tell you what to leave out.



Is aerial footage enough on its own?


No. Aerial confirms size. It doesn't carry character or purpose. A masterplan filmed from 120 metres looks like the planning drawing it came from.


The same shot also means different things to different people. Three hundred new homes from above reads as ambition to an investor and as a threat to the family next door. Aerial works best as the establishing shot that sets up a story told at ground level. If the scheme has interiors worth showing, an FPV fly-through takes the viewer inside in a way a standard drone can't.



Can one shoot serve every audience?


Yes, if it's planned that way from the start. One well-briefed shoot can produce a planning cut, an investor cut and a community cut, each with its own edit, narration and length, plus short form for social. That's a content system rather than a single video, and it's how I approach property and construction films.


What it can't do is fix a brief written after filming. Decide the audiences first, and on live sites get the drone permissions sorted in pre-production. The shot list follows on its own.



Quick answers


How long should a property development video be?


It depends on who is watching. A planning or investor film usually runs two to three minutes. Community and social cuts work best at under a minute.


Should a property video use CGI or real footage?


Both, when the scheme isn't built yet. CGI shows what's coming. Real footage of the site and the streets around it proves it belongs there.


When should filming start on a new development?


Before ground breaks. Footage of the untouched site becomes the before shot in every progress film and completion walkthrough that follows.


Got a scheme coming up? Send me the site and the audience and I'll tell you what the brief needs. No site visit needed to get started.




Shot By Taz is a video production and FPV drone company based in Nottingham, filming across the East Midlands, including Derby, Leicester, Lincoln, Loughborough and Mansfield.

 
 
 

Comments


bottom of page